News Detail

Solution for intelligent drainage control system

 

Background

Establish an automatic control system for underground drainage, to realize centralized monitoring and management of the entire system by the ground control center, equipment protection control, and intelligent start- stop operation mode of equipment to ensure the safe and efficient operation of the entire system.


Target

Remote start, stop and online monitoring of groundwater pumps in the ground control center to realize unattended pump room. Design pumps to automatically work in turn, so that the utilization rate of each pump and its pipeline is evenly distributed. When a pump or its own valve fails, the system automatically sends out sound and light alarms, and dynamically flashes on the computer to record the accident.


System composition

Set up a PLC control station in the underground central substation which is responsible for the control and management of drainage pumps. Detect pump current, water level, the pressure and flow of water supply pipelines, etc. The PLC automation control system is connected with the main control (dispatching) system through redundant Ethernet ring network. Realize the modern production management mode of the remote centralized control room.


Data monitoring

In real time monitor the water level of water tank, water supply pressure, water supply flow, motor temperature, vibration and other data.

Control function

Flexible and diverse control methods meet the different needs of normal production, commissioning and maintenance, and realize centralized monitoring in the ground command center.

Optimization Strategy


Automatic job rotation:

To prevent some water pumps and their electrical equipment from being worn out too fast, damp or other failures due to long-term operation, when emergent start is required but pumps cannot be operated which affects normal work, taking equipment maintenance and system safety into consideration, design automatic pump rotation, and the system automatically records the running time of pumps, and determine the number of pumps to be turned on by comparing the recorded data.

Avoidance peak and fulling valley control:

The system can determine the time of turning on and off pumps according to the power grid load and the time period of the power supply price in the flat, valley and peak period stipulated by the power supply department. Try to work in the "flat period" and "valley period", and try to avoid e working in "peak period".


Effects

Pump rotation system to improve system reliability;

"Avoidance peak and fulling valley" mode to reduce power consumption;

High-precision water level prediction ensures smooth and stable production;


Share to:
Set Homepage | Favorite
 
京公网安备 18000000000号 | 京ICP备 1234545345-1号
关注亚美体育·(中国)有限公司官网
亚美体育·(中国)有限公司官网
解决方案
项目案例

International Marketing Department :

Manager Guo  0086 18631510809

Manager Cui  0086 18618124822

Whatsapp: 0086 18631510809

facebook: guoyanming06@gmail.com


Headquarters: West Gucheng Road, Shijingshan District, Beijing

Tel: 0086 010-82433901

Email: guoyanming06@163.com


R&D Base: Shougang Industrial Park, Qian'an City, Hebei Province

Tel: 0086 0315-7710888

Subscribe Our Wechat Official Account